small text size medium text size large text size print this article mail this article  

Notice to Mariners No 41 of 2011

Lifting of vessel MV Lady Davinia

01 June 2011

The Ports and Yachting Directorate, Transport Malta, notifies mariners that as from Thursday 2nd June works will be underway to lift the submerged vessel MV Lady Davinia at Sliema Seafront in Marsamxett Harbour.

Seacraft shall be employed to lift the vessel which is lying in position:

LATITUDE (N) LONGITUDE (E)
   
35° 54.400' 14° 30.446'

Mariners are instructed to give a wide berth of at least 50m to the seacraft carrying out the lifting during the operation as they may have restricted maneuverability.

Position is referred to WGS 84 Datum
Charts Affected:    BA 177